A meeting with the data center engineer to ask a long list of questions about their network architecture, topologies and infrastructure

2

Create a drawing of network and data center layout as well as the fiber infrastructure necessary to connect all of the devices within their network

3

Take initial drawings back to customer and adjusting for additional cable connections for different parts of the network

4

Weeks of revisions, scheduling and meetings to land on a design

5

Finally land on Designs, drawings and a bill of material

6

Create a quote